top of page

CARNIVAL BUILD DAY! Project 2

Project 2: Build New Walls (entrance wall & DR wall): DEADLINE: 12:30pm

--> THIS MUST BE STARTED AFTER PROJECT 1 IS COMPLETE

  1. Attach one of the walls with a door in it to the walls you just finished in project 1.

  2. Measure the space between the wall you just finished and the actual wall to the classroom find flats from the flat loft that will fit in this space (as closely as possible)

  3. Brace flats using L-braces—come get me when you have collected the flats needed and measured the space and I can help you with this if you don’t know what this means.

  4. Build a small wall if needed to close in any gaps (if your flats didn’t quite fill the space).


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page