top of page

CARNIVAL BUILD DAY! Project 1

Project 1: FINISH BUILDING WALLS: DEADLINE: 10:30am

  1. Attach short 2x4s to the longer 2x4s that are currently drilled into the control panel platform using 3” screws. These are “braces”.

  2. Attach flats to the 2x4 braces. Be sure to use 2.5” screws. The flat with the hole in the middle of it should go in the middle.

  3. Using the precut 2x4s, attach the Hollywood flats (for the STINE ROOM) to the flats for the FUGUE room at the TOP of the flat to create stability in the walls and for the control room.


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page